We love to bring to life as a developer and I aim the today do this using what ever front tools necessary.

We love to bring to life as a developer and I aim the today do this using what ever front tools necessary.

New Mukesh Patel School of Technology Management and Engineering

Clients:

Shri Vile Parle Kelvani Mandal

Project Value:

INR 540 Lakhs

Date:

February 24, 2026

Project Overview

The New Mukesh Patel School of Technology Management and Engineering project was undertaken for Shri Vile Parle Kelavani Mandal, with a project value of ₹540 lakhs. The development comprises lower and upper basement levels, lower and upper ground levels, and eight upper floors. The project scope covered an integrated range of life-safety, security, automation, and IT infrastructure, including Fire Alarm & Public Address (FAPA), access control, physical security, Building Management System (BMS), and IT systems. Solutions from Bosch, Virdi, Kaba, and Honeywell were incorporated across the project

  • Project Name:

    New Mukesh Patel School of Technology Management and Engineering

  • Client:

    Shri Vile Parle Kelvani Mandal

  • Project Value:

    INR 540 Lakhs

  • Project Size:

    LB+UB+LG+UG+8 Floor

  • Scope :

    FAPA, Access, Physical Security, BMS, IT

  • Makes:

    Bosch, Virdi, Kaba, Honeywell

  • Consultant: